Permanent Service | 2/17/2006 | 2/17/2006 | 2/21/2006 | P | PASS |
William E Thomas
|
|
|
need inspection on hot tub installation. thank you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH hot tub ok, still need to check the recep for tub
|
Final | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PASS |
Pat Lass
|
|
|
###-#### ned final inspection. as early as possible, thank you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|
Electrical Rough-In | 2/17/2006 | 2/17/2006 | 2/17/2006 | P | PASS |
William E Thomas
|
|
|
need inspection on hot tub installation. thank you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH This is for the spa- ok to cover conduit, conection to spa ok. Need to test the gfci recep on next visit
|
Permanent Service | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
William E Thomas
|
|
|
please inspect so we can get power back on for heat. thank you; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h r ok
|
Application received | | | 2/15/2006 | | DONE |
|
|
|
This permit was created on the web by BRIAN KEITH
|