Third Notice ELE | 2/9/2007 | 2/9/2007 | 2/27/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 12/26/2006 | 12/26/2006 | 2/9/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 11/21/2006 | 11/21/2006 | 12/26/2006 | | DONE |
Bob Reichert
|
|
|
|
Final | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 8:30:47 AM. Contact: ###-####. called contr, about strapping rnc and gec into gen panel, survey, gen has been field evaluated, ok to final
|
ELE-Aging Inspection | 10/17/2006 | 10/17/2006 | 10/24/2006 | | CANC |
Jack Frank
|
|
|
|
ELE-Aging Inspection | 8/14/2006 | 8/14/2006 | 8/14/2006 | | DONE |
Bob Reichert
|
|
|
called, working on getting field evauation for generator, Generator apparently not connected per elect.
|
Final | 6/11/2006 | 6/12/2006 | 6/12/2006 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/11/2006 at 10:15:42 PM. Contact: ###-####. met contr, left corr notice, nedds some strapping, nec 110.3(A) and BCC 4-05-33(A(&(B) generator shall be listed and labelled
|
Final | 5/30/2006 | 5/30/2006 | 5/30/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/30/2006 at 6:09:52 AM. Contact: ###-####. all checked except adding generator for later, signed t/o card, will call ltr
|
Electrical Rough-In | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/17/2006 at 11:09:17 AM. Contact: ###-####. ok to cover u/g to gen
|
Electrical Rough-In | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 9:57:53 AM. Contact: ###-####. r/i for cutin switches ok
|
Conference | 4/23/2006 | 4/24/2006 | 4/24/2006 | A | CANC |
Bob Reichert
|
|
|
We request a conference to discuss the use of this office space and what the code requires,since there have been questions concerning the occupancy. We would request both Bob and Jim to be present sometime between 8:00am and 10:00am at your convenience. Thank you Koyama Inc.; Phone #: ###-#### Internet Inspection Request from: kendall bender see ri
|
Electrical Rough-In | 4/24/2006 | 4/24/2006 | 4/24/2006 | A | PASS |
Bob Reichert
|
|
|
We request a conference to discuss the use of this office space and what the code requires,since there have been questions concerning the occupancy. We would request both Bob and Jim to be present sometime between 8:00am and 10:00am at your convenience. Thank you Koyama Inc.; Phone #: ###-#### Internet Inspection Request from: kendall bender called for conference, met with 324 and 370 and contr, then gave ri inspection, walls only ok to cover
|
Electrical Rough-In | 4/17/2006 | 4/17/2006 | 4/17/2006 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 4/17/2006 at 10:04:34 AM. Contact: ###-####. conf with electrician need approved set of prints designnating what each room is going used for.
|
Conference | 3/29/2006 | 3/30/2006 | 3/30/2006 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/29/2006 at 11:32:24 AM. Contact: ###-####. met contr to discuss remodel for new tenant, will provide 2 rooms for patient care areas, and fix violations
|
Application received | | | 3/17/2006 | | DONE |
|
|
|
This permit was created on the web by John Campbell
|