Second Notice ELE | 12/26/2006 | 12/26/2006 | 12/29/2006 | | DONE |
|
|
|
This permit finaled on the web by Rowdy Monroe
|
First Notice | 10/2/2006 | 10/2/2006 | 12/26/2006 | | DONE |
Bob Reichert
|
|
|
|
Final | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PASS |
Bob Reichert
|
|
|
Internet Inspection Request from: Rowdy Monroe ok to final
|
Conference | 8/22/2006 | 8/22/2006 | 8/22/2006 | A | DONE |
Bob Reichert
|
|
|
contr called about listing, went to job, but listing sheets sent by supplier not sufficient to satisfy labelling requirements, told probably need field evaluation, told try to get resolution soon because of correction notice
|
Final | 8/9/2006 | 8/9/2006 | 8/9/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/9/2006 at 6:36:18 AM. Contact: ###-####. all ok except air comp for fire line, called contr, left corr notice, BCC -4-05-33(A)(B) air compressor shall be listed and labelled by recognized testing lab, signed t/o card, gave 10 days to fix
|
Electrical Rough-In | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | PASS |
Bob Reichert
|
|
|
underground inspection Internet Inspection Request from: Rowdy Monroe u/g around inside of bldg and elect room ok to cover
|
Electrical Rough-In | 5/24/2006 | 5/24/2006 | 5/24/2006 | A | PASS |
Bob Reichert
|
|
|
underground inspection from existing building to new building Internet Inspection Request from: Rowdy Monroe u/g from old bldg to new ok to cover
|
Electrical Rough-In | 4/7/2006 | 4/7/2006 | 4/7/2006 | P | PASS |
Bob Reichert
|
|
|
this is a reinspection request for the rebar ground Internet Inspection Request from: Rowdy Monroe not using concrete encased copper electrode, rebar only ok
|
Electrical Rough-In | 4/6/2006 | 4/6/2006 | 4/6/2006 | P | CANC |
Bob Reichert
|
|
|
this is for a rebar ground inspection Internet Inspection Request from: Rowdy Monroe elect hadn't been there, said to cancel and he will recall
|
Application received | | | 4/6/2006 | | DONE |
|
|
|
This permit was created on the web by Rowdy Monroe
|