First Notice | 6/29/2006 | 6/29/2006 | 7/21/2006 | | DONE |
Jack Frank
|
|
|
|
Final | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | PASS |
Jack Frank
|
|
|
jim - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok card signed
|
Final | 6/27/2006 | 6/27/2006 | 6/27/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 6:19:55 AM. Contact: ###-####. met contr, left corr notice, nec 410.30(C)(1)(1) luminaire shall be directly below recpt, 406.5 faceplate shall completely cover opening 404.9(A) faceplates shall be installed, BCC permanent address and nameplate for meter shall be installed, core and shell of building shall be finalled before tenant space finalled
|
Permanent Service | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/21/2006 at 8:18:55 AM. Contact: ###-####. p/s exst meter pak n ok
|
Electrical Rough-In | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/1/2006 at 8:35:23 AM. Contact: ###-####. corr made, ri walls and ceilings ok
|
Electrical Rough-In | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 7:30:43 AM. Contact: ###-####. called contr, left corr notice,nec 352.30)A) rnc shall be strapped within 3' of box, 110.3(B) listed or labelled equip shall be installed with instructions included, 300.4(A)&(D) edge of holes and raceway shall be 1 1/4" from edge of framing member, BCC all make-up shall be done, low voltage shall be installed
|
Electrical Rough-In | 4/21/2006 | 4/24/2006 | 4/24/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/21/2006 at 1:36:35 PM. Contact: ###-####. u/g ok to cover
|
Application received | | | 4/17/2006 | | |
|
|
|
|
Issue & PRINT permit | | | 4/17/2006 | | |
|
|
|
|
Owner Supplied Equipment | 4/17/2006 | | | | |
|
|
|
|