Final | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | PASS |
Jack Frank
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok
|
Electrical Rough-In | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jack Frank
|
|
|
peter - call 1/2 hr prior for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley r/i ok needs #10 equip grd too grd heater bath rm
|
Electrical Rough-In | 6/1/2006 | 6/6/2006 | 6/6/2006 | A | FAIL |
William E Thomas
|
|
|
paul Note: please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 1. B.C.C. requires all makeup to be completed prior to roughin inspection.
|
Electrical Rough-In | 5/18/2006 | 5/19/2006 | 5/19/2006 | A | NR |
Pat Lass
|
|
|
pete Note: please call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no make-up done. had conf. about circuiting and required outlets. seperate permit required for service and sub panel.
|
Electrical Rough-In | 5/11/2006 | 5/18/2006 | 5/18/2006 | A | NH |
William E Thomas
|
|
|
peter ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa no access, called and left message
|
Application received | | | 5/4/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/4/2006 | | DONE |
|
|
|
|