Second Notice ELE | 7/6/2006 | 7/6/2006 | 7/10/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 6/8/2006 | 6/8/2006 | 7/6/2006 | | DONE |
Pat Lass
|
|
|
|
Final | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 3:32:49 PM. Contact: ###-####.
|
Final | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | NR |
Pat Lass
|
|
|
bob- ###-#### cell remove tile for the length of run and make required corrections straping and covers installed
|
Electrical Rough-In | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 4:14:34 PM. Contact: ###-####. 1. walls only ok to cover. 2. cieling still needs to be in spected. 3. cieling tiles that were removed and then replaced as part of the electrical work/demolition need to be left open for inspection.
|
Application received | | | 5/23/2006 | | |
|
|
|
|
Issue permit | | | 5/23/2006 | | DONE |
|
|
|
|