Final | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PASS |
Pat Lass
|
|
|
zane; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Electrical Rough-In | 4/3/2007 | 4/4/2007 | 4/4/2007 | A | PASS |
Pat Lass
|
|
|
zane; Phone #: ###-#### Internet Inspection Request from: Victoria Beall R/I Ok
|
Final | 11/22/2006 | 11/22/2006 | 11/24/2006 | P | PART |
Jim Schmer
|
|
|
Zane, plesse call 1st for access; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt outlet & sw cond not 6" out of bx jms
|
Final | 11/20/2006 | 11/21/2006 | 11/21/2006 | P | CANC |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 2:23:46 PM. Contact: ###-####. home owner canc. was not ready
|
Electrical Rough-In | 10/31/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Jim Schmer
|
|
|
zane - note: as close to 1:00 as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith underground ok, chg sw. box under panel for outside lt, put main in panel for gragage and 2 grd. rds. JMS
|
Electrical Rough-In | 10/22/2006 | 10/23/2006 | 10/23/2006 | A | FAIL |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 10/22/2006 at 8:14:52 PM. Contact: ###-####. j-box in ground, lb in ground, need to expose or remove, and change conduit to all same size. JMS
|
Final | 10/18/2006 | 10/19/2006 | 10/19/2006 | A | CANC |
Jim Schmer
|
|
|
zane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles change to conference, service riser to small, grd. rods not connected right, grds to sub panels not installed properly, neutrals need identified and other corrections also. jms
|
Final | 10/17/2006 | 10/18/2006 | 10/18/2006 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/17/2006 at 1:44:57 PM. Contact: ###-####. job not ready called home ower t/w him regarding grounding, bonding, & sub panel. note he was not at job site.
|
Application received | | | 6/6/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/6/2006 | | DONE |
|
|
|
|