Final | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
William E Thomas
|
|
|
the contractor was fired and I didn''t get to finiosh this job. Phone #: ###-#### Internet Inspection Request from: Andy Derrick . 1. the job was finished by another electrical contractor under a differant permit. .
|
PRINT ACTIONS | | | 7/25/2006 | | |
|
|
|
|
Electrical Rough-In | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | PASS |
Pat Lass
|
|
|
andy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Conference | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | PART |
Pat Lass
|
|
|
###-#### - andy Note: as early as possible afternoon talked about knob an d tube and basement remodel
|
Issue permit | | | 6/7/2006 | | DONE |
|
|
|
|
Application received | | | 6/7/2006 | | |
|
|
|
|