Final | 12/26/2006 | 12/27/2006 | 12/27/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/26/2006 at 6:25:29 PM. Contact: ###-####. ok
|
Final | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | FAIL |
Jack Frank
|
|
|
wayne ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith fee due corr. called left message 680.43(B) lights over hot tub shall be be of type noted by 680.43(B)(1) (c) 1& 2
|
Reinspection Fee (no hold) | 12/6/2006 | 12/6/2006 | 12/6/2006 | A | DONE |
Jack Frank
|
|
|
wayne ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith fee due corr.
|
Final | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 4:10:30 PM. Contact: ###-####. see ri, wrong type inspection
|
Electrical Rough-In | 8/2/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/1/2006 at 4:10:30 PM. Contact: ###-####. ric ok, told to move light over hot tub, rest of tub ok, will call for final
|
Application received | | | 8/1/2006 | | |
|
|
|
|
Issue permit | | | 8/1/2006 | | DONE |
|
|
|
|