Electrical Rough-In | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | CANC |
Bob Reichert
|
|
|
Work performed by Steve Johnson.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz wrong type insp, see final
|
Final | 9/21/2006 | 9/21/2006 | 9/21/2006 | A | PASS |
Bob Reichert
|
|
|
Work performed by Steve Johnson.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz met contr to move recpt, ok to final
|
Electrical Rough-In | 9/18/2006 | 9/20/2006 | 9/20/2006 | P | FAIL |
Bob Reichert
|
|
|
Work performed by Steve Johnson.; Phone #: ###-#### Internet Inspection Request from: Matt Santacruz called, left corr notice, nec 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 210.52(A)(1) recpts shall be installed so that no point along wall space is over 6' from an outlet, 314.20 boxes in combustible walls shall be flush with the finished surface, BCC all make-up shall be done, and boxes added
|
Application received | | | 9/18/2006 | | DONE |
|
|
|
This permit was created on the web by Matt Santacruz
|