Final | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PASS |
Jack Frank
|
|
|
greg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok
|
Rough-In Permanent Service | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/2/2006 at 8:53:47 AM. Contact: ###-####. survey posted 300.4(A)(1)&(D) called r/i p/s u/g new ok
|
Rough-In Permanent Service | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 9:30:08 AM. Contact: ###-####. nail plates and parallel protection and box still not flush
|
Reinspection Fee (no hold) | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 9:30:08 AM. Contact: ###-####. corrections not made that Jack wrote.
|
Rough-In Permanent Service | 10/26/2006 | 10/26/2006 | 10/26/2006 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/26/2006 at 7:11:38 AM. Contact: ###-####. corr, called 300.4(A)(1)&(D) nail plates and 11/4" parallel inside outside edges same for low voltage contr, 334.30 staple cables within 12" at panel, 314.20 outside light box garage exit door shall be flush with siding, needs protection cables garage attic access 6ft
|
Permanent Service | 10/26/2006 | 10/26/2006 | 10/26/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/26/2006 at 7:11:38 AM. Contact: ###-####. r/i failed, p/s u/g new ok
|
Application received | | | 10/25/2006 | | |
|
|
|
|
Issue permit | | | 10/25/2006 | | DONE |
|
|
|
|