Final | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Jack Frank
|
|
|
Please call Michelle 30 min. prior@###-#### Phone #: ###-#### Internet Inspection Request from: Heather Packer ok
|
Final | 8/28/2007 | 8/29/2007 | 8/29/2007 | A | FAIL |
Jack Frank
|
|
|
Final - pls call Michelle w/Gammill @ ###-#### 30min prior for access. Scheduled by Heather w/Doherty Phone #: ###-#### Internet Inspection Request from: Heather Packer called Jim with doherty, need access to jtub receptacle cannot get tester in it to check for gfci
|
Final | 8/27/2007 | 8/28/2007 | 8/28/2007 | P | NH |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 8/27/2007 at 10:23:34 AM. Contact: ###-####. 1. no access, not home.
|
Electrical Rough-In | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PASS |
Bob Reichert
|
|
|
in-floor heating, under tile. Tile guy should be there for access. To ensure access pls call contractor - Tim Gammill 1/2 hr before @ ###-####. Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer ok to cover floor for heat
|
Electrical Rough-In | 11/14/2006 | 11/15/2006 | 11/15/2006 | A | PASS |
Bob Reichert
|
|
|
Please call Jim w/ Doherty @ ###-#### 1/2 hr before for access. Thanks! Scheduled by Heather w/Doherty; Phone #: ###-#### Internet Inspection Request from: Heather Packer ric ok bath walls and ceiling, need to see floor
|
Application received | | | 11/14/2006 | | DONE |
|
|
|
This permit was created on the web by Heather Packer
|