CHANGE STATUS TO (F) | | | 7/9/2007 | | DONE |
|
|
|
this permit closed out per no longer working on this project anymore, refer to ele07-01641 (Romar Elec) for continuing electrical work.
|
Rough-In Permanent Service | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | FAIL |
Jack Frank
|
|
|
Rough-in, approval for cover on conduits and interior portion. Early morning, if possible. Phone #: ###-#### Internet Inspection Request from: Kathy Briggs corr post for u/g 310.15 (B&C) required spacing for u/g duct bank and raceways on top of it, r/i inside fail needs secure support for emt at boxes
|
Rough-In Permanent Service | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PART |
Jack Frank
|
|
|
Underground inspection and approval for cover. Phone #: ###-#### Internet Inspection Request from: Kathy Briggs walls rest rms janitor rm and u/g behind bld, u/g needs some spacing between conduits contr will comply met with him
|
Electrical Rough-In | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | PART |
Jack Frank
|
|
|
Inspection of ground ring trench. Phone #: ###-#### ok
|
Rough-In Permanent Service | 2/22/2007 | 2/23/2007 | 2/23/2007 | P | PART |
Jack Frank
|
|
|
Underground inspection - if possible, 3:00 or later. Phone #: ###-#### u/g west norh, east sides
|
Rough-In Permanent Service | 2/7/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Jack Frank
|
|
|
Underground piping inspection. Phone #: ###-#### ok west side
|
Permanent Service | 12/12/2006 | 12/13/2006 | 12/13/2006 | A | CANC |
Jack Frank
|
|
|
Ufer & underground conduit inspection for generator & transfer switch.; Phone #: ###-#### Internet Inspection Request from: Kathy Briggs see added r/i
|
Electrical Rough-In | 12/13/2006 | 12/13/2006 | 12/13/2006 | A | PART |
Jack Frank
|
|
|
Ufer & underground conduit inspection for generator & transfer switch.; Phone #: ###-#### Internet Inspection Request from: Kathy Briggs ok
|
Application received | | | 12/12/2006 | | DONE |
|
|
|
This permit was created on the web by Kathy Briggs
|
Telephone call | | | | | |
|
|
|
spoke with owner Bill Ramsey ###-#### about lowing final value per not on this project anymore, Romar Elec. took over (ele07-01641). Told him only need to pull permit for value of work up to the point they actually did and can submit letter for refund. He said as of now they have been pais $748,000 but still in legal battle and value may go up. He said will contact us when settled with final value and will request refund.
|