Final | 3/22/2007 | 3/22/2007 | 3/22/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/22/2007 at 6:53:39 AM. Contact: ###-####. ok to final
|
Final | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | CANC |
Mike Kinnear
|
|
|
zane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wrong type inspection
|
Electrical Rough-In | 1/10/2007 | 1/10/2007 | 1/10/2007 | A | PASS |
Mike Kinnear
|
|
|
zane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok cover ri
|
Rough-In Permanent Service | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/28/2006 at 10:09:13 AM. Contact: ###-####. see ri and p/s
|
Electrical Rough-In | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/28/2006 at 10:09:13 AM. Contact: ###-####. called left corr notice, nec 210.70(A)(3) equip space shall have switched lighting outlet, 210.63 recpt shall be installed in equip room , 300.14 6" of free conductor shall be provided at fan box,BCC all make-up shall be done, boxes installed, will see u/g to garage ltr, service panel may lose work space unless a/c lines are moved
|
Permanent Service | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/28/2006 at 10:09:13 AM. Contact: ###-####. p/s u/g n ok
|
Electrical Rough-In | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | NH |
Bob Reichert
|
|
|
Zane; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called, told contr to call in what wants and when not locked up
|
Application received | | | 12/27/2006 | | |
|
|
|
|
Issue permit | | | 12/27/2006 | | DONE |
|
|
|
|