Final | 4/3/2007 | 4/3/2007 | 4/3/2007 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/3/2007 at 7:01:39 AM. Contact: (208) ok corrections made
|
Final | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | FAIL |
Jack Frank
|
|
|
Greg pls call for access; Phone #: ###-#### Internet Inspection Request from: Stacie Backus 408.4 circuit directory be specific as gto purpose and use, 408.7 seak breaker KO with approved means called left ,message
|
Rough-In Permanent Service | 1/15/2007 | 1/16/2007 | 1/16/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 7:45:29 PM. Contact: ###-####. R/I Ok P/S U/g N Ok
|
Rough-In Permanent Service | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/12/2007 at 7:41:15 AM. Contact: ###-####. corrections not made
|
Reinspection Fee (no hold) | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/12/2007 at 7:41:15 AM. Contact: ###-####. tried to contact electrician but only got a machine. MNC still not protected and no protection of live parts on service.
|
Rough-In Permanent Service | 1/11/2007 | 1/11/2007 | 1/11/2007 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/11/2007 at 7:27:51 AM. Contact: ###-####. corr. not made called left message, nail plates inside outside edges all locations check top plates
|
Reinspection Fee (no hold) | 1/11/2007 | 1/11/2007 | 1/11/2007 | P | DONE |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/11/2007 at 7:27:51 AM. Contact: ###-####. fee due reinspection failed 3rd time out
|
Rough-In Permanent Service | 1/10/2007 | 1/10/2007 | 1/10/2007 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/10/2007 at 7:17:29 AM. Contact: ###-####. corr. not made called nail plates and protect cables witin 6ft attic access
|
Reinspection Fee (no hold) | 1/10/2007 | 1/10/2007 | 1/10/2007 | A | DONE |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/10/2007 at 7:17:29 AM. Contact: ###-####. fee due corr. not made
|
Rough-In Permanent Service | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/9/2007 at 7:22:02 AM. Contact: ###-####. corr. called left message, BCC complete all make up all boxes, 300.4 nail plates, 334.23 protect cables 6ft of attic access
|
Application received | | | 1/8/2007 | | |
|
|
|
|
Issue permit | | | 1/8/2007 | | DONE |
|
|
|
|