Case Summary (ELE) | | | 7/2/2013 | | DONE |
|
|
|
|
Second Notice ELE | 3/22/2007 | 3/22/2007 | 3/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/7/2007 | 3/7/2007 | 3/22/2007 | | DONE |
Pat Lass
|
|
|
|
Final | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | PASS |
Pat Lass
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Electrical Rough-In | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 1:25:37 PM. Contact: ###-####. ceiling R/I Ok
|
Electrical Rough-In | 2/14/2007 | 2/15/2007 | 2/15/2007 | P | FAIL |
William E Thomas
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 1. the E.C.'s work was fine. 2. The failure on the inspection is for the new and existing lowvoltage cables, and exesting raceways on the grid.
|
Electrical Rough-In | 1/23/2007 | 1/23/2007 | 1/23/2007 | A | PART |
Pat Lass
|
|
|
call Steve 1/2 hour before please. 11th floor Moffatt Thomas S/W. Walls. Call Loren at ###-#### if no answer. Phone #: ###-#### walls ok
|
Application received | | | 1/22/2007 | | |
|
|
|
|
Issue permit | | | 1/22/2007 | | DONE |
|
|
|
|