First Notice | 12/8/2008 | 12/8/2008 | 3/3/2009 | | DONE |
Bob Reichert
|
|
|
|
ELE-Aging Inspection | 12/8/2008 | 12/8/2008 | 12/8/2008 | | DONE |
Bob Reichert
|
|
|
talked to contracror, see final, no esc this project
|
Final | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PASS |
Bob Reichert
|
|
|
talked with contractor, ok to final, no esc this project
|
ELE-Aging Inspection | 10/8/2008 | 10/8/2008 | 10/13/2008 | | DONE |
Bob Reichert
|
|
|
called contractor to schedule an inspection if they are ready, told to verify if ground lugs terminated to in light poles, no esc this project
|
Electrical Rough-In | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PASS |
Bob Reichert
|
|
|
ron - cover for the ditch; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover u/g
|
Electrical Rough-In | 2/7/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Bob Reichert
|
|
|
ron Note: cover; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover driveway as needed, need to see posts before full cover
|
Application received | | | 2/7/2007 | | |
|
|
|
|
Issue permit | | | 2/7/2007 | | DONE |
|
|
|
|
Second Notice ELE | 3/3/2009 | 3/3/2009 | | | |
|
|
|
First Notice has not been responded to.
|