Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE07-00573
StatusFinaled
Name LEA ELECTRIC LLC
Site Address 7200 W BARRISTER DR
Project Name 
Customer Number2622
ePlanReview 
Description
Electrical Permit - New: Furnish and install wiring as per proposal dated 10/19/06.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice ELE1/9/20081/9/20081/30/2008 DONE
DetailsPatricia Smith
This permit finaled on the web by Tina Payne
Second Notice ELE12/26/200712/26/20071/9/2008 DONE
DetailsPatricia Smith
First Notice has not been responded to.
First Notice12/13/200712/13/200712/26/2007 DONE
DetailsBob Reichert
Final12/12/200712/13/200712/13/2007APASS
DetailsBob Reichert
Scheduled by a contractor via Hello! on 12/12/2007 at 2:47:56 PM. Contact: ###-####. x-ray machine ok per 324, ok to final, signed occupancy card
Conference11/28/200711/29/200711/29/2007ADONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 11/28/2007 at 3:29:58 PM. Contact: ###-####. met gen contr, x-ray man, talked about listing for x-ray machine, he will let 324 know if ok via UL.
Conference11/27/200711/28/200711/28/2007ADONE
DetailsBob Reichert
Scheduled by a contractor via Hello! on 11/27/2007 at 12:45:14 PM. Contact: ###-####. couldn't get electrician on phone, left message, told general contractor what required to get field evauation for x-ray machine
Final11/20/200711/21/200711/21/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 11/20/2007 at 2:08:46 PM. Contact: ###-####. met contractor, dental chair ok, left correction notice nec 110.3(B) & BCC 4-05-33(A)(B) x-ray equipment shall be listed and labelled by a nationally recognized testing lab, did not sign any card
Final10/24/200710/25/200710/25/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/24/2007 at 3:17:00 PM. Contact: ###-####. talked to contractor about roof top recpts, not required, still no dental chair or x-ray equipment, left correction notice signed to card
Final10/23/200710/24/200710/24/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 10/23/2007 at 10:50:59 AM. Contact: ###-####. add some strapping for emt and flex and receptacles for roof-top units: some are over 25 feet, rest ok for final, will call back when done. NOTE: no dental chair or x-ray equipment installed
Electrical Rough-In9/20/20079/24/20079/24/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/20/2007 at 3:21:10 PM. Contact: ###-####. ceilings anop
Electrical Rough-In8/30/20078/30/20078/30/2007APASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 8/30/2007 at 7:12:22 AM. Contact: ###-####.
. 1. ri as noted on prints ok. .
Permanent Service8/30/20078/30/20078/30/2007PPASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 8/30/2007 at 7:12:22 AM. Contact: ###-####.
. 1. p/s u/g n ok. .
Electrical Rough-In8/29/20078/29/20078/29/2007APASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 8/29/2007 at 6:53:13 AM. Contact: ###-####.
1. as noted on prints ok.
Electrical Rough-In8/22/20078/23/20078/23/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 8/22/2007 at 10:52:22 AM. Contact: ###-####. walls and ceilings ok to cover anop
Electrical Rough-In8/16/20078/17/20078/17/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 8/16/2007 at 7:45:04 AM. Contact: ###-####. ceilings anop ok to cover
Electrical Rough-In8/9/20078/10/20078/10/2007APART
DetailsPat Lass
Scheduled by a contractor via Hello! on 8/9/2007 at 11:53:48 AM. Contact: ###-####.
hard lids ANOP
Electrical Rough-In7/31/20078/1/20078/1/2007APART
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 7/31/2007 at 1:26:09 PM. Contact: ###-####.
1. as noted on prints ok.
Electrical Rough-In7/10/20077/10/20077/10/2007PPASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 7/10/2007 at 9:13:43 AM. Contact: ###-####.
1. as noted on prints ok to cover.
Electrical Rough-In6/29/20076/29/20076/29/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 6/29/2007 at 6:38:47 AM. Contact: ###-####. ok to pour cnds over west cells for ceiling cover
Electrical Rough-In6/27/20076/28/20076/28/2007PCANC
DetailsBob Reichert
Scheduled by a contractor via Hello! on 6/27/2007 at 8:25:19 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jun 28 2007 9:03AM.
Electrical Rough-In4/6/20074/9/20074/9/2007APART
DetailsJack Frank
Scheduled by a contractor via Hello! on 4/6/2007 at 2:00:38 PM. Contact: ###-####. u/g ok
Electrical Rough-In3/29/20073/29/20073/29/2007PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/29/2007 at 6:48:24 AM. Contact: ###-####. east part u/g ok to pour slab
Electrical Rough-In3/22/20073/22/20073/22/2007PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/22/2007 at 6:05:58 AM. Contact: ###-####. ok to pour south 1/3 slab
Electrical Rough-In3/8/20073/9/20073/9/2007PPART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/8/2007 at 11:49:33 AM. Contact: ###-####. ok to cover u/g east side foundation conduit
Electrical Rough-In3/6/20073/7/20073/7/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 3/6/2007 at 9:13:25 AM. Contact: ###-####. west side main u/g and stem walls ok to pour
Electrical Rough-In2/26/20072/27/20072/27/2007APART
DetailsBob Reichert
Scheduled by a contractor via Hello! on 2/26/2007 at 12:05:03 PM. Contact: ###-####. ok to pour gec
Application received  2/20/2007 DONE
This permit was created on the web by Vicki Moore