Third Notice ELE | 5/29/2007 | 5/29/2007 | 7/9/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 5/14/2007 | 5/14/2007 | 5/29/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/27/2007 | 4/27/2007 | 5/14/2007 | | DONE |
Jack Frank
|
|
|
|
Final | 4/27/2007 | 4/27/2007 | 4/27/2007 | P | PASS |
Jack Frank
|
|
|
Chad call to set time if possible he needs to be there to let you in; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
|
Electrical Rough-In | 4/3/2007 | 4/3/2007 | 4/3/2007 | P | PASS |
Jack Frank
|
|
|
zac; Phone #: ###-#### Internet Inspection Request from: Victoria Beall r/i ok
|
Electrical Rough-In | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | FAIL |
Jack Frank
|
|
|
Cover...Ryan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus corr. do not cover called left message 300.4(A)(1)&(D) nail plates and 11/4", 250.32(B)(2) terminate GEC at neutral bus and install bond screw, 110.3(B) shall install main breaker per manu. instructions panel used as lighting panel, all 3 garages
|
Electrical Rough-In | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PASS |
William E Thomas
|
|
|
zac - underground inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall underground ok
|
Application received | | | 3/13/2007 | | |
|
|
|
|
Issue permit | | | 3/13/2007 | | DONE |
|
|
|
|