Second Notice ELE | 10/12/2007 | 10/12/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/25/2007 | 9/25/2007 | 10/12/2007 | | DONE |
Jack Frank
|
|
|
|
Final | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
Jack Frank
|
|
|
stu Phone #: ###-####
|
Electrical Rough-In | 4/11/2007 | 4/11/2007 | 4/11/2007 | P | PASS |
William E Thomas
|
|
|
Stu; Phone #: ###-#### Internet Inspection Request from: Stacie Backus walls only ok for cover-- they will have the cieling tiles open to let us better see what has been done above the grid.
|
Electrical Rough-In | 4/10/2007 | 4/10/2007 | 4/10/2007 | A | NR |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/10/2007 at 6:55:48 AM. Contact: ###-####. they will call for another insp when all the low voltage is done in the walls
|
Application received | | | 4/4/2007 | | |
|
|
|
|
Issue permit | | | 4/4/2007 | | DONE |
|
|
|
|