Second Notice ELE | 9/7/2007 | 9/7/2007 | 9/7/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/24/2007 | 8/24/2007 | 9/7/2007 | | DONE |
Pat Lass
|
|
|
|
Final | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Pat Lass
|
|
|
Doug; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Rough-In Permanent Service | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PASS |
Pat Lass
|
|
|
Upstairs rough and service. We are waiting on an answer as to how the units will be addressed so that we can label the meters. Thanks Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot R/I Ok P/S U/G N Ok
|
Rough-In Permanent Service | 6/15/2007 | 6/18/2007 | 6/18/2007 | A | PART |
Pat Lass
|
|
|
Rough in and service inspection for lower floors only. Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot 1st floor R/I Ok meters not labled yet.
|
Electrical Rough-In | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PASS |
William E Thomas
|
|
|
Service trench inspection Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot this was for an idaho power feed conduit to the meter, contractor wanted it inspected for the excavator.
|
Application received | | | 4/30/2007 | | DONE |
|
|
|
This permit was created on the web by Barbara Szurgot
|