Final | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | PASS |
Jack Frank
|
|
|
mike Phone #: ###-#### ok
|
Electrical Rough-In | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
William E Thomas
|
|
|
mike Note: heat in bathroom floor Phone #: ###-#### 1. bathroom ok.
|
Permanent Service | 6/21/2007 | 6/21/2007 | 6/21/2007 | P | PASS |
Jim Schmer
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang p/s o/h rec - ok jms (make sure bottom of drip lp is 18" off roof on final)
|
Electrical Rough-In | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PASS |
Pat Lass
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Electrical Rough-In | 5/24/2007 | 5/24/2007 | 5/24/2007 | P | PASS |
William E Thomas
|
|
|
mike - needs pipe inspected ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith underground ok, talked at length with M.W. about the project and answered some questions for him.
|
Electrical Rough-In | 5/16/2007 | 5/16/2007 | 5/16/2007 | P | PASS |
Jim Schmer
|
|
|
mike--upher ground please for concrete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok jms
|
Electrical Rough-In | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | PART |
Pat Lass
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall electrode ok for concrete
|
Application received | | | 5/15/2007 | | |
|
|
|
|
Issue permit | | | 5/15/2007 | | DONE |
|
|
|
|