Third Notice ELE | 10/12/2007 | 10/12/2007 | 11/2/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 9/26/2007 | 9/26/2007 | 10/12/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/29/2007 | 8/29/2007 | 9/26/2007 | | DONE |
Pat Lass
|
|
|
|
Final | 8/28/2007 | 8/29/2007 | 8/29/2007 | A | PASS |
Pat Lass
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Electrical Rough-In | 8/21/2007 | 8/21/2007 | 8/21/2007 | P | PASS |
Pat Lass
|
|
|
matt- ceiling Phone #: ###-####
|
Electrical Rough-In | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | NR |
Pat Lass
|
|
|
Ceiling grid; Matt; Phone #: ###-#### Internet Inspection Request from: Hattie James didnot understand the correction so i explained the requirements and drew a picture.
|
Electrical Rough-In | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | FAIL |
William E Thomas
|
|
|
Ceiling grid; Lonnie; Phone #: ###-#### Internet Inspection Request from: Hattie James 1. 300.11--all over
|
Electrical Rough-In | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | FAIL |
William E Thomas
|
|
|
Ceiling grid; Lonnie; Phone #: ###-#### Internet Inspection Request from: Hattie James 1. 300.11
|
Conference | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PART |
Pat Lass
|
|
|
Skip; Phone #: ###-#### Internet Inspection Request from: Darla Downs had conf about services grounding and grouping. at this time the 3 disconnects for the 3 phase service are grouped. the single phase services will be labeled now, and they shall be grouped as new tennents are cycled into spaces.
|
Permanent Service | 8/7/2007 | 8/7/2007 | 8/7/2007 | P | PASS |
Pat Lass
|
|
|
Skip; Phone #: ###-#### Internet Inspection Request from: Darla Downs check for all grounds tied together and labeling on disconnects on next inspection.
P/S U/G R Ok to transfer power.
|
Conference | 8/3/2007 | 8/6/2007 | 8/6/2007 | P | CANC |
Pat Lass
|
|
|
skip - 12:30 per pat lass Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
Permanent Service | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/31/2007 at 8:23:22 AM. Contact: ###-####. raceway bonded with #6 should be #4. grounding jumper in meter is connected with dissimmilar materials. install connector on GEC. I talked to dave about determining the building extent and passed on that the general or electrical contractor has to go to plan review and get the info on ho this building is devided.
|
Permanent Service | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/27/2007 at 4:06:56 PM. cow group disconnects properly fuse wires and bring grounding up to code.
|
Electrical Rough-In | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PASS |
Pat Lass
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Electrical Rough-In | 6/8/2007 | 6/12/2007 | 6/12/2007 | A | FAIL |
Pat Lass
|
|
|
sheetrock; Matt; Phone #: ###-#### Internet Inspection Request from: Hattie James Protection and support of mc cable and loose setscrews. had conf. with electrician.
|
Application received | | | 6/6/2007 | | |
|
|
|
|
Issue permit | | | 6/6/2007 | | DONE |
|
|
|
|