Final | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
William E Thomas
|
|
|
scott Phone #: ###-#### . 1. final ok. .
|
Electrical Rough-In | 10/5/2007 | 10/8/2007 | 10/8/2007 | A | PASS |
Jack Frank
|
|
|
scott Phone #: ###-#### r/i ok
|
Electrical Rough-In | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | FAIL |
Jack Frank
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James corr, met owner 110.3(B) needs main breaker at garage panel per manufacture, 300.4 nail plates and 11/4" use listed conn or plastic conn for GEC, 300.14 free length grds cuts too short BCC no violations retained hot tub, told owner if corrections not made or more created his permit will be voided
|
Electrical Rough-In | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PART |
Jack Frank
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James electrode and u/g ok only
|
Electrical Rough-In | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | CANC |
Bob Reichert
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James see conf
|
Conference | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | DONE |
Bob Reichert
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James owner not ready, too many corrections, reviewed problem areas, he is going to change scope of work and update permit to include service change, talked about prepare concrete encased electrode before pour, 370 said ok to cover u/g for part of driveway where service from house is coming from
|
Conference | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | DONE |
Jack Frank
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James talked with owner told him NECrequirements depending on the methods he uses
|
Application received | | | 7/18/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/18/2007 | | DONE |
|
|
|
|