Final | 3/6/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Pat Lass
|
|
|
must call 1/2 hr. before, need to meet Miles to get in. Phone #: ###-#### Internet Inspection Request from: Miles Berry
|
Final | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PART |
Pat Lass
|
|
|
need to call Miles- (Berry electrical services)to get access to inspect. ###-#### Phone #: ###-#### Internet Inspection Request from: Miles Berry will call for final when work bench in front of sub panels in garage is moved. everything else is ok
|
Final | 7/30/2007 | 7/31/2007 | 7/30/2007 | A | PART |
Pat Lass
|
|
|
AM as per Pat Lass Phone #: ###-#### Internet Inspection Request from: Miles Berry ok to energize for 3 days at which time grounding and clearance problems shall be resolved P/S U/G R Ok
|
Permanent Service | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | PART |
Pat Lass
|
|
|
AM as per Pat Lass Phone #: ###-#### Internet Inspection Request from: Miles Berry ok to energize for 3 days at which time grounding and clearance problems shall be resolved P/S U/G R Ok
|
Final | 7/26/2007 | 7/30/2007 | 7/30/2007 | P | NR |
Bob Reichert
|
|
|
service inspection & final on pole barn Phone #: ###-#### Internet Inspection Request from: Miles Berry called, left message and notice, nh, nr, BCC all u/g shall be seen before cover, all makeup shall be seen before devices installed, shall have ri before final inspection, nec 250.52 shall use metal water pipe for gec,and 250.52(D)(2) shall augment water pipe with 2 ground rods and be inspected before cover
|
Telephone call | | | 7/30/2007 | | DONE |
|
|
|
bob reichert called in and said to attach this permit to bld07-01103
|
Issue permit | | | 7/24/2007 | | DONE |
|
|
|
|