Final | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-#### ok to final, owner moved in, checked available receptacles only, no esc this project
|
ELE-Aging Inspection | 12/1/2009 | 12/1/2009 | 12/4/2009 | | DONE |
Bob Reichert
|
|
|
no activity
|
Electrical Rough-In | 9/29/2009 | 9/29/2009 | 9/29/2009 | P | PASS |
Bob Reichert
|
|
|
john Phone #: ###-#### corrections made, ric ok, no esc this project
|
Electrical Rough-In | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | FAIL |
Bob Reichert
|
|
|
corrections not all made, created others, will call back after install new box for broken cable clamp, use looms for wiring support, lengthen short ground wires, add securing for wires within 8" of box, no esc this project
|
Electrical Rough-In | 9/24/2009 | 9/25/2009 | 9/25/2009 | A | FAIL |
Jack Frank
|
|
|
john Phone #: ###-#### met owner corr. 410.2&16 clearence for closet fixtures, 210.52(A) outlet spacing, fixed panel of sider, recepts not allowed above baseboard heaters, 210.52(F)&210.11(C)(2)all recept outlets in laundry rm shall be 20 amp laundry circuit, 314,16 box fill everywhere 314.43 screws not alled in non-metallic boxes, 300.14 shall provide 6" free length conductor note some of the violations posted are the same ones noted on prior inspection back in 2008
|
Electrical Rough-In | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | NR |
Bob Reichert
|
|
|
John Phone #: ###-#### thought we would be there after 3, still had to do hall, closet and laundry room, told to recall when done, no esc this project
|
Electrical Rough-In | 3/6/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Bob Reichert
|
|
|
John Phone #: ###-####ric ok for kitchen, bedroom, downstairs utilities anop, no esc this project
|
Electrical Rough-In | 3/5/2009 | 3/6/2009 | 3/6/2009 | A | NR |
Bob Reichert
|
|
|
John Phone #: ###-#### met owner, told that he must be done before he calls for inspection, no esc this project
|
Electrical Rough-In | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PART |
Bob Reichert
|
|
|
john Phone #: ###-#### corrections made, ok to cover dining room only, owner made layout, signed plan also, no esc this project
|
Electrical Rough-In | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Jack Frank
|
|
|
John Phone #: ###-#### mey owner job not ready and violations makeup, shall address small appliance branch circuits, no screws in plastic boxes, nail plates and 11/4" outside recept install all boxes dinning rm
|
Electrical Rough-In | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 8:09:50 AM. Contact: ###-####. living room and front bath only ok to cover, no wiring in ceiling on south side if covered next trip, no esc
|
Electrical Rough-In | 4/17/2008 | 4/17/2008 | 4/17/2008 | P | NR |
Bob Reichert
|
|
|
john Phone #: ###-#### met owner, explained make-up had to be done and 1 1/4" shall be provided for for nm cable, shall staple nm within 8" of boxes
|
Conference | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | DONE |
Bob Reichert
|
|
|
john Phone #: ###-#### talked about upgrade roof and getting rid old knob and tube, bringing open areas up to code, when to call for ri inspection
|
Application received | | | 8/24/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/24/2007 | | DONE |
|
|
|
|