Final | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Lynn Cable
|
Electrical Rough-In | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | PART |
Pat Lass
|
|
|
Need inspection on light niche and potting compound so they are able to fill the pool. Phone #: ###-#### Internet Inspection Request from: Lynn Cable potting ok
|
Electrical Rough-In | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | PART |
Pat Lass
|
|
|
inspection for underground, We also added another bonding wire in the North east corner of the pool Thanks Phone #: ###-#### Internet Inspection Request from: Lynn Cable underground and bonding conductor ok
|
Electrical Rough-In | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PART |
Pat Lass
|
|
|
I need an inspection on the pool and equipment bonding and the underground. The first 25ft from the light niche will be under concrete. If you have any other questions or helpful suggestions on how to do stuff better give me a call. First time doing a pool. Thanks Phone #: ###-#### Internet Inspection Request from: Lynn Cable bonding ok depth of conduit not 18 in.
|
Application received | | | 9/25/2007 | | DONE |
|
|
|
This permit was created on the web by Lynn Cable
|