Second Notice ELE | 6/10/2008 | 6/10/2008 | 6/11/2008 | | DONE |
Patricia Smith
|
|
|
This permit finaled on the web by Todd Holbrook
|
First Notice | 5/21/2008 | 5/21/2008 | 6/10/2008 | | DONE |
William E Thomas
|
|
|
|
Final | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | PASS |
William E Thomas
|
|
|
chris Phone #: ###-#### . .1. final ok. . .
|
Electrical Rough-In | 4/24/2008 | 4/24/2008 | 4/24/2008 | P | PASS |
Pat Lass
|
|
|
###-#### ceiling inspection Internet Inspection Request from: Todd Holbrook . 1. this was shifted to pat for inspection. U/G And ceiling ok
|
Permanent Service | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PASS |
Pat Lass
|
|
|
###-#### Internet Inspection Request from: Todd Holbrook P/S U/G N Ok
|
Permanent Service | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | NR |
Mike Kinnear
|
|
|
###-#### Internet Inspection Request from: Todd Holbrook conf with electrician grounded & grounding conductors shall put together on the same bus bar, paralel conductors shall the the same lenght, & a manafactures bonding jumper shall be used.
|
Electrical Rough-In | 2/29/2008 | 2/29/2008 | 2/29/2008 | P | PART |
Pat Lass
|
|
|
###-#### Internet Inspection Request from: Todd Holbrook walls and hard lids ok
|
Electrical Rough-In | 2/20/2008 | 2/21/2008 | 2/21/2008 | A | PART |
Pat Lass
|
|
|
Ceiling inspection main area ###-#### Internet Inspection Request from: Todd Holbrook ceiling above paint booth ok
|
Electrical Rough-In | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | CANC |
William E Thomas
|
|
|
underground 3" pvc Internet Inspection Request from: Todd Holbrook . 1. main swing under the slab ok for cover. .
|
Application received | | | 11/15/2007 | | |
|
|
|
|
Issue permit | | | 11/15/2007 | | DONE |
|
|
|
|