Final | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/7/2008 at 7:34:54 AM. Contact: ###-####. ok to final, no esc this project
|
Electrical Rough-In | 1/20/2008 | 1/22/2008 | 1/22/2008 | A | PASS |
William E Thomas
|
|
|
key is at door on side of home where garage is. Phone #: ###-#### Internet Inspection Request from: Cevyn Recla . 1. final ok. .
|
Electrical Rough-In | 1/17/2008 | 1/17/2008 | 1/17/2008 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/17/2008 at 6:25:19 AM. Contact: ###-####. called, left correction notice, nec 250.52(A)(1) shall provide connection for incoming water pipe, 300.4(A) edge of bored holes shall be 1 1/4" from edge of framing members, 210.52(A)(2) shall provide receptacle in 2' wall in kitchen, 250.148(C) shall ground metal boxes, 314.20 boxes shall be flush with finished surface in walls of combustible material, NOTE: shall locate listing label for jetted tub
|
Permanent Service | 11/15/2007 | 11/15/2007 | 11/15/2007 | P | PASS |
Pat Lass
|
|
|
george Phone #: ###-#### ground rods ok check water grounding/bonding on rough-in P/S U/G R Ok to change from overhead to u/g
|
Application received | | | 11/15/2007 | | |
|
|
|
|
Issue permit | | | 11/15/2007 | | DONE |
|
|
|
|