Third Notice ELE | 7/14/2008 | 7/14/2008 | 7/15/2008 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 6/26/2008 | 6/26/2008 | 7/14/2008 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 6/5/2008 | 6/5/2008 | 6/26/2008 | | DONE |
Pat Lass
|
|
|
|
Final | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Pat Lass
|
|
|
Final issues noted by Bob. Phone #: ###-#### Internet Inspection Request from: Todd Sellman no esc permit
|
Final | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PART |
Bob Reichert
|
|
|
Phase 2 first floor. Phone #: ###-#### Internet Inspection Request from: Todd Sellman called contractor, people moved into offices, construction material fills rest of offices, no access to test all receptacles, switch and receptacle covers missing in room on left on entry and 1 office missing receptacle plate,no prints or general contractor available, need to check for dual level light switching rear offices, need to find listing on furniture in center of room, and see how many circuits to power pole and furniture, need to finish panel schedule, did not leave correction notice, but contractor will call in again when ready
|
Electrical Rough-In | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PASS |
Pat Lass
|
|
|
Ceiling rough in. Phone #: ###-#### Internet Inspection Request from: Todd Sellman
|
Electrical Rough-In | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Pat Lass
|
|
|
Ceiling rough in inspection on phase 2 first floor. Phone #: ###-#### Internet Inspection Request from: Todd Sellman low voltage and flex shall not be on the grid. support all raceways properly. remove all box covers for grounding inspection and make up all grounds in each box according to 250.148. only 1 fixture is permitted to be fed from a fixture whip.
|
Electrical Rough-In | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | PASS |
Bob Reichert
|
|
|
Phase two wall rough-in. Phone #: ###-#### Internet Inspection Request from: Todd Sellman phase 2 walls only ok to cover
|
Final | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | PART |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Sellman looked at conference room, hall, and breakroom on 1st floor- ok to final this area only, office adjacent to conference room already has employees in it
|
Electrical Rough-In | 3/19/2008 | 3/20/2008 | 3/19/2008 | A | PASS |
Mike Kinnear
|
|
|
Ceiling. Phone #: ###-#### Internet Inspection Request from: Todd Sellman ok cover ceiling only
|
Electrical Rough-In | 3/18/2008 | 3/19/2008 | 3/19/2008 | A | NR |
Mike Kinnear
|
|
|
Ceiling Phone #: ###-#### Internet Inspection Request from: Todd Sellman conf with electrician box fill, mc cable 12inch supports box to box, ko seals, & ceiling wire used for support shall be id & go from ceiling to grid ceiling with proper cable supports
|
Electrical Rough-In | 3/17/2008 | 3/17/2008 | 3/17/2008 | P | FAIL |
Pat Lass
|
|
|
Ceiling inspection. Phone #: ###-#### Internet Inspection Request from: Todd Sellman properly support raceways and cables install covers seal unused openings and remove unused low voltage cables.
|
Electrical Rough-In | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Sellman corrections made, ok to cover 1st floor hall and kitchenette walls only
|
Electrical Rough-In | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | FAIL |
Pat Lass
|
|
|
2nd part of wall rough in. call chad with the listed number for enty. Phone #: ###-#### Internet Inspection Request from: Todd Sellman cut in boxes not permitted and undersized
|
Electrical Rough-In | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | PART |
Jack Frank
|
|
|
Call Chad early for access. Phone #: ###-#### Internet Inspection Request from: Todd Sellman walls in new lobby and conference rms, and u/g
|
Application received | | | 1/14/2008 | | DONE |
|
|
|
This permit was created on the web by Todd Sellman
|