ELE-Aging Inspection | 10/9/2009 | 10/12/2009 | 10/12/2009 | A | DONE |
Doug A Poedy
|
|
|
Joe Phone #: ###-####
|
Final | 10/12/2009 | 10/12/2009 | 10/12/2009 | P | PASS |
Doug A Poedy
|
|
|
Contractor only did rough in. New permit must be obtained for final.
|
Electrical Rough-In | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | FAIL |
Jack Frank
|
|
|
Pat, we fixed the cut emt. It runs the A/C''s on roof. Joe Phone #: ###-#### Internet Inspection Request from: Joseph Zumwalt called 300.10 & 12 fittings and locknuts not made up tight, 1 locknut not even installed , no equip grd when fittings are loose
|
Reinspection Fee (no hold) | 2/6/2008 | 2/6/2008 | 2/6/2008 | A | DONE |
Jack Frank
|
|
|
Pat, we fixed the cut emt. It runs the A/C''s on roof. Joe Phone #: ###-#### Internet Inspection Request from: Joseph Zumwalt fee due corr.
|
Electrical Rough-In | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | NR |
Pat Lass
|
|
|
joe Phone #: ###-#### feeder damaged after joe finished and must be fixed prior to rough-in approval
|
Application received | | | 2/4/2008 | | |
|
|
|
|
Issue permit | | | 2/4/2008 | | DONE |
|
|
|
|