Second Notice ELE | 3/20/2008 | 3/20/2008 | 3/24/2008 | | DONE |
Tisha Gallop
|
|
|
This permit finaled on the web by Shawna Gates
|
First Notice | 3/6/2008 | 3/6/2008 | 3/20/2008 | | DONE |
Jack Frank
|
|
|
|
Final | 3/5/2008 | 3/6/2008 | 3/6/2008 | P | PASS |
Jack Frank
|
|
|
jim Phone #: ###-#### ok card signed
|
Electrical Rough-In | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Jack Frank
|
|
|
This is a re-inspection for heating units in ceiling. Jim Stansell is the contact electrician, his # is ###-####. Phone #: ###-#### Internet Inspection Request from: Heather Packer ok
|
Electrical Rough-In | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | FAIL |
Bob Reichert
|
|
|
Re-inspection for changes requested by Jack Frank. For questions pls call Jim w/Doherty @ ###-####. Scheduled by Heather w/Doherty. Phone #: ###-#### Internet Inspection Request from: Heather Packer called, corrections not made, duct in front of panel in center area
|
Electrical Rough-In | 2/26/2008 | 2/27/2008 | 2/27/2008 | A | PART |
Jack Frank
|
|
|
RI - for questions pls call Jim w/Doherty @ ###-####. Scheduled by Heather w/Doherty. Phone #: ###-#### Internet Inspection Request from: Heather Packer ceilings ok except where heat units panels in ceilings are located needs clearence for panels
|
Conference | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | DONE |
Jack Frank
|
|
|
Conference with Jim w/Doherty @ ###-####. Scheduled by Heather w/Doherty. Phone #: ###-#### Internet Inspection Request from: Heather Packer told them what ever they do shall meet NEC requirements
|
Electrical Rough-In | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PART |
Jack Frank
|
|
|
RI for the walls. Questions pls call Jim w/Doherty @ ###-####. Scheduled by Heather w/Doherty Phone #: ###-#### Internet Inspection Request from: Heather Packer walls only corr. posted on BLD permit for ceilings no violations retained support boxes raceways cables, and remove unused cables
|
Application received | | | 2/12/2008 | | DONE |
|
|
|
This permit was created on the web by Heather Packer
|