Final | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Pat Lass
|
|
|
Lonnie ###-####
|
Final | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | FAIL |
Jack Frank
|
|
|
lonnie Phone #: ###-#### met owner, kit countertops shall be fed from 2 SABC, outside front outlet shall not be on SABC
|
Electrical Rough-In | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
Pat Lass
|
|
|
scott Phone #: ###-#### R/I Ok No esc in project
|
Electrical Rough-In | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | FAIL |
Pat Lass
|
|
|
lonnie Phone #: ###-#### protect Romex
|
Electrical Rough-In | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | PART |
Pat Lass
|
|
|
scott Phone #: ###-#### bathroom R/I Ok
|
Permanent Service | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | CANC |
Pat Lass
|
|
|
scott Phone #: ###-#### P/S O/H R Ok
|
Electrical Rough-In | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | CANC |
William E Thomas
|
|
|
lonnie Phone #: ###-#### . .1. thry want Pat Lass to inspect the work. . .
|
(F) Reprint permit | | | 3/27/2008 | | DONE |
|
|
|
|
Conference | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | PART |
Pat Lass
|
|
|
lonnie Phone #: ###-#### talked about kitchen bath service and laundry room circuiting and general wiring.
|
Conference | 3/21/2008 | 3/24/2008 | 3/24/2008 | A | CANC |
Pat Lass
|
|
|
lonnie Phone #: ###-#### a man named scott showed up and I told him that the conf. woutd have to be with Lonnie.
|
Application received | | | 3/21/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/21/2008 | | DONE |
|
|
|
|