Second Notice ELE | 5/7/2008 | 5/7/2008 | 5/9/2008 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 4/14/2008 | 4/14/2008 | 5/7/2008 | | DONE |
Jack Frank
|
|
|
|
Final | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PASS |
Jack Frank
|
|
|
brian Phone #: ok no card
|
Electrical Rough-In | 4/3/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 4/3/2008 at 8:54:58 PM. Contact: ###-####. r/i show window recpts and sign circuit installed
|
Electrical Rough-In | 3/31/2008 | 4/1/2008 | 4/1/2008 | A | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/31/2008 at 9:03:46 PM. Contact: ###-####. needs show window recepts and sign circuit before final, walls and hard ceilings ok
|
Application received | | | 3/26/2008 | | |
|
|
|
|
Issue permit | | | 3/26/2008 | | DONE |
|
|
|
|