Second Notice ELE | 6/10/2008 | 6/10/2008 | 6/12/2008 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 5/30/2008 | 5/30/2008 | 6/10/2008 | | DONE |
Jack Frank
|
|
|
|
Final | 5/29/2008 | 5/30/2008 | 5/30/2008 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 12:26:05 PM. Contact: ###-####. ok card signed
|
Rough-In Permanent Service | 4/24/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/24/2008 at 12:07:55 PM. Contact: ###-####. corrections made, ric ok, p/s, exst meter pak, n, ok
|
Rough-In Permanent Service | 4/23/2008 | 4/23/2008 | 4/23/2008 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/23/2008 at 7:53:49 AM. Contact: ###-####. called, left correction notice, BCC shall install mains for service, shall final bld for core and shall, shall post address, NEC 348.30(A) shall strap fmc (mc cable) within 12" of panel, 110.26 shall provide work space in front of service, 110.26(F)(1)(b) there shall be no foreign piping over panel
|
Rough-In Permanent Service | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/22/2008 at 8:10:48 AM. Contact: ###-####. . . 240.24B must have access to all overcurrent devices. . .
|
Application received | | | 4/7/2008 | | |
|
|
|
|
Issue permit | | | 4/7/2008 | | DONE |
|
|
|
|