First Notice | 6/3/2008 | 6/3/2008 | 6/12/2008 | | DONE |
Jack Frank
|
|
|
|
Final | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 6/2/2008 at 12:00:25 PM. Contact: ###-####. ok card signed no ESC
|
Final | 5/29/2008 | 5/30/2008 | 5/30/2008 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 5/29/2008 at 12:25:18 PM. Contact: ###-####. corr posted called shall provide dual lever switching for office space per approved set of plans page 9 electric & hvac
|
Rough-In Permanent Service | 4/24/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/24/2008 at 12:07:09 PM. Contact: ###-####. corrections made, ric ok, p/s, exst meter pak, n, ok
|
Rough-In Permanent Service | 4/23/2008 | 4/23/2008 | 4/23/2008 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/23/2008 at 7:53:00 AM. Contact: ###-####. called contractor, left correction notice, BCC shall install mains for service, shall final core and shell BLD permit, shall post address, NEC 362.30 shall securely fasten ent within 3' of termination, 110.26 shall provide workspace in front of service
|
Rough-In Permanent Service | 4/22/2008 | 4/22/2008 | 4/22/2008 | P | FAIL |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 4/22/2008 at 8:09:59 AM. Contact: ###-####. . . 240.24B must have access to all overcurrent devices. ...
|
Electrical Rough-In | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 4/7/2008 at 10:03:07 AM. Contact: ###-####. u/g for 2 floor boxes only ok to cover
|
Application received | | | 4/7/2008 | | |
|
|
|
|
Issue permit | | | 4/7/2008 | | DONE |
|
|
|
|