Final | 10/31/2008 | 10/31/2008 | 10/31/2008 | P | PASS |
Bob Reichert
|
|
|
theodore Phone #: ###-#### ok to final
|
Electrical Rough-In | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PASS |
Pat Lass
|
|
|
Ted- call 30 min prior to going Phone #: ###-####
|
Electrical Rough-In | 7/14/2008 | 7/14/2008 | 7/14/2008 | P | FAIL |
Bob Reichert
|
|
|
ted Phone #: ###-#### met owner, gave corrections, BCC all make-up shall be done, NEC 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, shall staple nm within 8" of box
|
Conference | 5/12/2008 | 5/12/2008 | 5/12/2008 | P | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 11:05:39 AM. Contact: ###-####. talked about when to call for ri inspection, lighting and receptacles, gfci breaker, outlet heights
|
Application received | | | 4/9/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/9/2008 | | DONE |
|
|
|
|