Final | 9/25/2009 | 9/25/2009 | 9/25/2009 | P | PASS |
Doug A Poedy
|
|
|
Ok final. Still needs pool and hot tub final on seperated permit.
|
DOC - Permit Finaled | 9/25/2009 | 9/25/2009 | 9/25/2009 | P | PASS |
Doug A Poedy
|
|
|
|
Electrical Rough-In | 9/1/2009 | 9/1/2009 | 9/1/2009 | P | PART |
Doug A Poedy
|
|
|
mike - late afternoon please Phone #: ###-####. Underground conduits for hot tub.
|
Override - Parcel Holds | 9/1/2009 | 1/1/1900 | 9/1/2009 | | |
|
|
|
rough in ele only
|
Electrical Rough-In | 7/27/2009 | 7/28/2009 | 7/28/2009 | A | PART |
Doug A Poedy
|
|
|
cover trenches inspection please-Allan Phone #: ###-####. Ok to cover trenches.
|
Override - Parcel Holds | 7/27/2009 | 1/1/1900 | 7/27/2009 | | |
|
|
|
rough in inspection
|
Electrical Rough-In | 7/16/2009 | 7/17/2009 | 7/17/2009 | A | PASS |
Doug A Poedy
|
|
|
Alan- pool bonding Phone #: ###-####. Pool bonding rough in ok.
|
Override - Parcel Holds | 7/16/2009 | 1/1/1900 | 7/16/2009 | | |
|
|
|
not final
|
Rough-In Permanent Service | 12/8/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Pat Lass
|
|
|
Please call to confirm time you will be on job 1 hour in advance. Thank You Phone #: ###-#### Internet Inspection Request from: Alan Lusk r/i ok p/s u/g n ok
|
Rough-In Permanent Service | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PART |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alan Lusk unable to access esc P/S Not ready R/I Ok
|
Electrical Rough-In | 11/17/2008 | 11/18/2008 | 11/18/2008 | P | PART |
Pat Lass
|
|
|
Roughin inspection to cover patio soffits. Phone #: ###-#### Internet Inspection Request from: Alan Luskcould not access esc. patio soffits ok
|
Conference | 10/30/2008 | 10/30/2008 | 10/30/2008 | A | PASS |
Pat Lass
|
|
|
Please inspect floor heat installed on island counter top. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS heat cable ok to cover
|
Conference | 10/27/2008 | 10/28/2008 | 10/28/2008 | P | PART |
Pat Lass
|
|
|
Conference to look at service disconnect and grounding. Phone #: ###-#### Internet Inspection Request from: Alan Lusk
|
Electrical Rough-In | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Pat Lass
|
|
|
need inspection of concrete incased ground wire for cover approal Phone #: ###-#### Internet Inspection Request from: Alan Lusk electrode ok
|
Electrical Rough-In | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PART |
Pat Lass
|
|
|
ground wire Phone #: ###-#### Internet Inspection Request from: Alan Lusk electrodes ok for concrete ssc on hold
|
Conference | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | DONE |
Mike Kinnear
|
|
|
Internet Inspection Request from: Alan Lusk t/w alan grounding each building concrete encased electrode. gutter for main
|
Electrical Rough-In | 6/26/2008 | 6/27/2008 | 6/27/2008 | P | PART |
Jack Frank
|
|
|
Inspect conduit for concrete pour for service below gutters in entrance shack. Phone #: ###-#### Internet Inspection Request from: Alan Lusk ok
|
Electrical Rough-In | 5/15/2008 | 5/16/2008 | 5/16/2008 | P | PART |
Pat Lass
|
|
|
Inspection to cover conduit in trench Phone #: ###-#### Internet Inspection Request from: Alan Lusk U/G Ok
|
Application received | | | 4/18/2008 | | DONE |
|
|
|
This permit was created on the web by Alan Lusk
|