Third Notice ELE | 6/26/2008 | 6/26/2008 | 6/27/2008 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Second Notice ELE | 6/10/2008 | 6/10/2008 | 6/26/2008 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 5/23/2008 | 5/23/2008 | 6/10/2008 | | DONE |
Bob Reichert
|
|
|
|
Final | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Abbott called contractor, ok to final
|
Conference | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | DONE |
Bob Reichert
|
|
|
We have made some changes. The riser will only be 9 inches above the tank so we changed out the pvc to ridgid and wraped it with corrision tape they would like to back fill tommorow thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott talked to contractor, see ri
|
Electrical Rough-In | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | PASS |
Bob Reichert
|
|
|
We have made some changes. The riser will only be 9 inches above the tank so we changed out the pvc to ridgid and wraped it with corrision tape they would like to back fill tommorow thanks Scott Phone #: ###-#### Internet Inspection Request from: Scott Abbott ok to cover raceway at east end
|
Final | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | CANC |
Bob Reichert
|
|
|
this project is at the restroom on the golf coarse Phone #: ###-#### Internet Inspection Request from: Scott Abbott talked to contractor, need to see final grade, see ri
|
Electrical Rough-In | 4/25/2008 | 4/25/2008 | 4/25/2008 | P | PASS |
Bob Reichert
|
|
|
this project is at the restroom on the golf coarse Phone #: ###-#### Internet Inspection Request from: Scott Abbott called contractor, u/g ok to cover, need to see final installation and cover for pull-box
|
Owner Supplied Equipment | | | 4/21/2008 | | |
|
|
|
|
Application received | | | 4/21/2008 | | DONE |
|
|
|
This permit was created on the web by Scott Abbott
|