Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE08-01028
StatusFinaled
Name NORTHWEST ELECTRICAL
Site Address 898 W GOWEN RD
Project Name 
Customer Number 
ePlanReview 
Description
Electrical Permit - New: New warehouse/office/for Norco
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice4/3/20094/3/20099/15/2009 DONE
DetailsBob Reichert
Final4/2/20094/3/20094/3/2009APASS
DetailsBob Reichert
Inspection on cylinder blasters with UL corrections. Phone #: ###-#### Internet Inspection Request from: Mark Sessionsn ok to final, signed occupancy card, esc finalled
Conference2/24/20092/24/20092/24/2009PDONE
DetailsMike Kinnear
meet bob 370 & norc people regard two sand blasting machines. bob felt that they should be field evaluated by an approved testing lab. the norco people said they were going to get this started.
Conference2/24/20092/24/20092/24/2009PDONE
DetailsBob Reichert
met with 412 and building people, looked at bottle sandblasting machines, determined that they require an evaluation by recognized testing laboratory. One of the machines (north) does not have thermal overloads for the motors, south machine does have, neither have proper labelling, overcurrent protection is not per drawing located on one machine, each has two sources of incoming power, need to see motors to verify ampacity,some of the internal components do not have proper listings, there are not assembly listings on the machines. The plant people indicated they would contact a nationally recognized testing lab for a field evaluation.
Conference2/12/20092/20/20092/20/2009ADONE
DetailsMike Kinnear
Conference inspection requested at 9:00 a.m. Contact Cornel Larson ###-####.; Phone #: ###-#### meeting with 324 & norco reps. regarding listings on equipment
Conference1/28/20091/28/20091/28/2009PDONE
DetailsMike Kinnear
Please call 15 minutes prior to arrive so we can meet you there. Phone #: ###-#### Internet Inspection Request from: Mark Sessions t/w norco owner & elcctrian all machinery shall be listed & so labled. they need to find the lables & show me. note esc permit has been finaled.
Final1/26/20091/28/20091/28/2009PCANC
DetailsMike Kinnear
Please call 15 minutes prior to arrive so we can meet you there. Phone #: ###-#### Internet Inspection Request from: Mark Sessions wrong type inspection
ELE-Aging Inspection12/2/200812/2/200812/2/2008 NR
DetailsMike Kinnear
t/w troy ###-#### norco just started moving equip. over
Electrical Rough-In10/2/200810/2/200810/2/2008PPASS
DetailsMike Kinnear
Jared Phone #: ###-#### ok cover under ground conduit for explosion box & seal off
Final9/26/20089/26/20089/26/2008PPART
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 9/26/2008 at 6:55:32 AM. Contact: ###-####. part final office area only
Electrical Rough-In9/17/20089/17/20089/17/2008APART
DetailsMike Kinnear
jared ###-#### ok class one area with switches & lights need to see at final
Electrical Rough-In9/15/20089/15/20089/15/2008PPASS
DetailsMike Kinnear
jared - recessed can at main entrance Phone #: ###-#### ok cover rec lights in entry. ext.
Conference9/11/20089/11/20089/11/2008PDONE
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 9/11/2008 at 7:06:42 AM. Contact: ###-####. conf sewer lift station
Final8/28/20088/28/20088/28/2008PCANC
DetailsMike Kinnear
Jared Phone #: ###-#### wrong type of inspection
Electrical Rough-In8/28/20088/28/20088/28/2008PPASS
DetailsMike Kinnear
Jared Phone #: ###-#### ok cover ceiling anop
Conference8/8/20088/19/20088/19/2008APASS
DetailsMike Kinnear
9:00 a.m. on site conference meeting with all trades - for any questions contact Jim Storey ok conf for early production area
Conference8/8/20088/19/20088/19/2008APASS
DetailsJim Schmer
9:00 a.m. on site conference meeting with all trades - contact Jim Storey with any questions
Electrical Rough-In8/14/20088/14/20088/14/2008PPASS
DetailsMike Kinnear
Jared Phone #: ###-#### ok cover hard lid ceiling anop
Rough-In Permanent Service8/14/20088/14/20088/14/2008APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 8/14/2008 at 6:40:24 AM. Contact: ###-####. ri not ready p/s u/g n ok note no meter base to put the sticker. will put it on when IPCO installs the meter base
Electrical Rough-In8/4/20088/4/20088/4/2008APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 8/4/2008 at 6:57:01 AM. Contact: ###-####. ok cover walls only anop
Electrical Rough-In7/25/20087/25/20087/25/2008APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 7/25/2008 at 6:36:09 AM. Contact: ###-####. ok cover walls only anop
Electrical Rough-In7/22/20087/22/20087/22/2008APASS
DetailsMike Kinnear
Scheduled by a contractor via Hello! on 7/22/2008 at 6:26:43 AM. Contact: ###-####. ok cover walls only anop
Electrical Rough-In5/21/20085/22/20085/22/2008APASS
DetailsMike Kinnear
Jared; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok cover under slab conduit north side building
Electrical Rough-In5/16/20085/19/20085/19/2008APART
DetailsMike Kinnear
jared - underground Phone #: ###-#### ok cover under slab condit south side
Electrical Rough-In5/12/20085/13/20085/13/2008APASS
DetailsMike Kinnear
sean Phone #: ###-#### ok cover under slab conduit under slab equip pad s. e. corner
Electrical Rough-In5/6/20085/7/20085/7/2008APASS
DetailsMike Kinnear
shawn - underground Phone #: ###-#### ok cover under slab conduit s.e. corner of blding & ext pole lights & power for fuel power
Electrical Rough-In4/30/20084/30/20084/30/2008PPASS
DetailsMike Kinnear
sean - late afternoon please Phone #: ###-#### ok cover boxes & conduit in stem walls
Electrical Rough-In4/23/20084/24/20084/24/2008APART
DetailsJack Frank
sean - uffer Phone #: ###-####
electrode ok
Application received  4/23/2008 DONE
This permit was created on the web by Mark Sessions
Conference2/12/20092/20/2009 A 
DetailsJim Schmer
Conference inspection at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####