First Notice | 10/1/2008 | 10/1/2008 | 11/24/2008 | | DONE |
Jack Frank
|
|
|
This permit finaled on the web by Beka Hereau
|
Final | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PASS |
Jack Frank
|
|
|
ok no card
|
Final | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | CANC |
Jack Frank
|
|
|
Final Electrical inspection, James is onsite Journeyman- Corrections made Phone #: ###-#### Internet Inspection Request from: Beka Hereau called will meet contr in AM he said they will have it opened at 7:15 am
|
Final | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | FAIL |
Jack Frank
|
|
|
Final Electrical Inspection, please call James @ ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau corr 300.7 seal freezer and cooler raceways(inside), 314.16 box fill handy box kit. equip, also strap MC 330.30, 100.26 (F)(1) clearence for panel, in room with WH upstairs, 250.104(A)(1) bond hot and cold T250.66, 210.8 com. kit gfci for 125 V recepts install all covers
|
Reinspection Fee (no hold) | 9/30/2008 | 9/30/2008 | 9/30/2008 | A | DONE |
Jack Frank
|
|
|
Final Electrical Inspection, please call James @ ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau fee due corr.
|
Electrical Rough-In | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
Pat Lass
|
|
|
Cover inspection for Kitchen Cieling Inspection job onsite contact Luke W. ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau
|
Electrical Rough-In | 7/3/2008 | 7/3/2008 | 7/3/2008 | P | PASS |
William E Thomas
|
|
|
Rough _in down stairs cieling cover inspection. Electrician on-site James ###-#### Phone #: ###-#### Internet Inspection Request from: Beka Hereau . .1. 1st floor drop cieling ok to cover. . .
|
Electrical Rough-In | 7/2/2008 | 7/3/2008 | 7/3/2008 | A | FAIL |
William E Thomas
|
|
|
Downstairs cieling rough-in to cover Phone #: ###-#### Internet Inspection Request from: Beka Hereau . .1. 300.11A--support wires shall be secured at both ends. . .
|
Electrical Rough-In | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | PASS |
William E Thomas
|
|
|
Down Stairs electrical wall inspection. James @###-#### will be on site Phone #: ###-#### Internet Inspection Request from: Beka Hereau . .1. furred out wall on 1st floor ok for cover. . . . .2. no cielling at this time. . .
|
Electrical Rough-In | 5/22/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Pat Lass
|
|
|
Rough-In inspection upstairs only Phone #: ###-#### Internet Inspection Request from: Beka Hereau 2nd floor walls ok
|
Application received | | | 5/14/2008 | | DONE |
|
|
|
This permit was created on the web by Beka Hereau
|