Final | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 7/2/2008 at 10:35:18 AM. Contact: ###-####. ok to final
|
Rough-In Permanent Service | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/19/2008 at 8:20:27 AM. Contact: ###-####. corrections made ric ok, p/s u/g rec ok
|
Rough-In Permanent Service | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | FAIL |
Bob Reichert
|
|
|
bicandi ele Phone #: ###-#### called, left correction notice, NEC 250.52(A)(1) shall ground to metal water pipe witjin 5' of entering building with #4, 352.30(A) shall secure rnc within 3' of panel, 334.30 nm shall be secured within 12" of panel, 210.52(A)(2) wall space over 2' shall have receptacles installed- kitchen north walls
|
Application received | | | 5/15/2008 | | |
|
|
|
|
Issue permit | | | 5/15/2008 | | |
|
|
|
|