Electrical Rough-In | 6/5/2008 | 6/6/2008 | 6/6/2008 | A | PASS |
Jack Frank
|
|
|
john - early as possible please Phone #: ###-#### or ###-####
|
Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | A | PASS |
Jack Frank
|
|
|
john - early as possible please Phone #: ###-#### or ###-#### ok
|
Permanent Service | 6/6/2008 | 6/6/2008 | 6/6/2008 | A | PASS |
Jack Frank
|
|
|
john - early as possible please Phone #: ###-#### or ###-#### p/s u/g rec. ok
|
Permanent Service | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | FAIL |
Jack Frank
|
|
|
john - ###-#### Phone #: ###-#### met owner corr. 250.64 & 92 shall provide required bonding for GEC, 300.10 if rigid used shall provide requied locknuts, 110.26(F)(1) clearence for panel. 408.41 1 neutral per terminal, 250.56 2 grd rods, COW no ESC
|
Conference | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | DONE |
Jack Frank
|
|
|
John Jack- please call 15 min before going out Phone #: ###-#### called answered owner's question told him to call if more question he said at this time he did not need a conference
|
Application received | | | 5/30/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/30/2008 | | DONE |
|
|
|
|