Final | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 11:10:31 AM. Contact: ###-####. ok
|
Final | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/21/2008 at 1:27:48 PM. Contact: ###-####. called correction not still needs clearence for downstairs bed rm closet
|
Final | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | NH |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/20/2008 at 4:24:01 PM. Contact: ###-####. no access
|
Reinspection Fee (no hold) | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | NH |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/20/2008 at 4:24:01 PM. Contact: ###-####.
|
Final | 10/17/2008 | 10/17/2008 | 10/17/2008 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/17/2008 at 7:53:50 AM. Contact: ###-####. corr called 410.2 &410.16 (C) clearence downstairs bed rm closet 210.52(A) outlet spacing right and left of shelves upstairs liv. rm
|
Electrical Rough-In | 7/18/2008 | 7/18/2008 | 7/18/2008 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/18/2008 at 9:36:27 AM. Contact: ###-####.
|
Permanent Service | 7/18/2008 | 7/18/2008 | 7/18/2008 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/18/2008 at 9:36:27 AM. Contact: ###-####. P/S U/G N Ok
|
Rough-In Permanent Service | 7/14/2008 | 7/14/2008 | 7/14/2008 | P | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/14/2008 at 7:48:30 AM. Contact: ###-####. box overfilled at bottom of stairs. Approved plans do not show range and microwave hood downstairs. It is shown as a wet bar not a kitchen.
|
Application received | | | 7/9/2008 | | |
|
|
|
|
Issue permit | | | 7/9/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|