Final | 4/24/2009 | 4/27/2009 | 4/27/2009 | A | PASS |
Pat Lass
|
|
|
Need to schedule in order to have pump house unlocked Pat Lass and I had discussed 8:15am as a meeting time if that changes please call Mike at ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
|
Final | 4/16/2009 | 4/20/2009 | 4/20/2009 | A | FAIL |
Pat Lass
|
|
|
WE NEED TO SCHEDULE A TIME TO GAIN ACCESS TO THE FACILITY PLEASE CALL MIKE AT ###-#### ON MONDAY MORNING TO CONFIRM MEETING TIME. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen bond electrodes together and install guy kit
|
ELE-Aging Inspection | 3/17/2009 | 3/17/2009 | 3/17/2009 | | NR |
Pat Lass
|
|
|
suc
|
Rough-In Permanent Service | 11/13/2008 | 11/13/2008 | 11/13/2008 | P | PASS |
Pat Lass
|
|
|
Mark is at job site and the service corrections have been made. Mark can be reached at ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen P/S U//G N Ok
|
Rough-In Permanent Service | 11/11/2008 | 11/12/2008 | 11/12/2008 | P | FAIL |
Jack Frank
|
|
|
Mark is at the job site and can be reached at ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen all violations not corrected, also needs listed choke main water bond in rigid inside of building, and shall bond CT can with both paralled conductors or a 1/0 copper
|
Reinspection Fee (no hold) | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | FAIL |
Jack Frank
|
|
|
Mark is at the job site and can be reached at ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen corr. fee due
|
Electrical Rough-In | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Mike Kinnear
|
|
|
Would like to have a rough cover inspection for the ceiling portion of the project. Dean is at the job ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen ok cover ceiling only
|
Conference | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | PART |
Pat Lass
|
|
|
Would like to meet at job site at around 9:00a.m. to go over some clearance isses, if there is a problem please Mike at ###-####. Dean will be the job site contact ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen talked about clearances
|
Rough-In Permanent Service | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | FAIL |
Pat Lass
|
|
|
If possible we would like the inspection as early as possible in the afternoon. This inspection is to energize the service disconnect only please call Mike any questions. ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen Main bonding jumper is not installed with screw to neutral bus and screw hole has damaged threads. Electrode connection is ok for concrete to be poured. working clearance will be checked on final per conversation with mike.
|
Conference | 10/7/2008 | 10/8/2008 | 10/8/2008 | A | DONE |
Mike Kinnear
|
|
|
Need phone confrence to discuss power swing to facility with only service disconnect and ATS installed at this juncture. Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen phone conf. with wayne it should be ok for service & ats on the ext. of building. if grounding & if service is ready.
|
Electrical Rough-In | 9/2/2008 | 9/3/2008 | 9/3/2008 | P | PASS |
Pat Lass
|
|
|
U/G INSPECTION FOR LATE A.M. IF YOU HAVE TIEM OR EARLY AFTERNOON WOULD WORK TALK WIHT LUKE OR MARK AT JOB SITE. PLEASE CALL MIKE @###-#### WITH ANY QUESTIONS. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen Ok for underground
|
Application received | | | 9/2/2008 | | DONE |
|
|
|
This permit was created on the web by Mike TenHulzen
|
First Notice | 4/27/2009 | 4/27/2009 | | | |
Pat Lass
|
|
|
|