Second Notice ELE | 3/3/2009 | 3/3/2009 | 3/16/2009 | | DONE |
Patricia Smith
|
|
|
First Notice has not been responded to.
|
First Notice | 10/29/2008 | 10/29/2008 | 3/3/2009 | | DONE |
Jack Frank
|
|
|
|
Final | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Jack Frank
|
|
|
This is ready for a final anytime today Phone #: ###-#### Internet Inspection Request from: Don Lustig card signed ok
|
Electrical Rough-In | 10/15/2008 | 10/15/2008 | 10/15/2008 | A | PASS |
Jack Frank
|
|
|
This is for ceiling cover up final to follow in the next day or two Phone #: ###-#### Internet Inspection Request from: Don Lustig ok
|
Electrical Rough-In | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | PART |
Jack Frank
|
|
|
The walls are ready for cover. Please look at the ceilings I know there are low voltage wires not tied up but let me know if any thing else needs fixed. Thanks Phone #: ###-#### Internet Inspection Request from: Don Lustig walls ok only needs to address low voltage in ceiling called
|
Application received | | | 9/11/2008 | | DONE |
|
|
|
This permit was created on the web by Don Lustig
|