First Notice | 10/30/2008 | 10/30/2008 | 1/15/2009 | | DONE |
Bob Reichert
|
|
|
|
Final | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 10:46:29 AM. Contact: ###-####. ok to final, signed structural card, no esc this project
|
Final | 10/24/2008 | 10/24/2008 | 10/24/2008 | P | NR |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/24/2008 at 9:57:18 AM. Contact: ###-####. met electricians, still re-wiring portion of building, told to re-call when done, and be sure access is available, no esc this project
|
Rough-In Permanent Service | 10/22/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/22/2008 at 5:40:49 AM. Contact: ###-####. ri ok, p/s, exst meter pak, n, ok, no esc this project
|
Rough-In Permanent Service | 10/21/2008 | 10/21/2008 | 10/21/2008 | A | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/21/2008 at 7:00:20 AM. Contact: ###-####. called contractor, NEC 310.16 conductor size too small to panel, no esc this project
|
Electrical Rough-In | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PASS |
Bob Reichert
|
|
|
John see guys on site Phone #: ###-#### ok to cover bath in shop area, no esc this project
|
Application received | | | 10/10/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/10/2008 | | DONE |
|
|
|
|