Case Summary (ELE) | | | 6/20/2016 | | DONE |
|
|
|
|
ELE-Aging Inspection | 8/2/2010 | 8/2/2010 | 8/2/2010 | | DONE |
Bob Reichert
|
|
|
see doc expire
|
DOC - Permit Expired | 8/2/2010 | 8/2/2010 | 8/2/2010 | A | PASS |
Bob Reichert
|
|
|
no activity
|
Electrical Rough-In | 7/20/2009 | 7/21/2009 | 7/21/2009 | A | PASS |
Doug A Poedy
|
|
|
jad Phone #: ###-####. Ok to cover.
|
Electrical Rough-In | 7/17/2009 | 7/20/2009 | 7/20/2009 | A | NR |
Doug A Poedy
|
|
|
chad Phone #: ###-####. Not quite finished. They will call again.
|
Electrical Rough-In | 11/25/2008 | 11/26/2008 | 11/26/2008 | A | PASS |
Pat Lass
|
|
|
DAVID Phone #: ###-#### NOTE: PLEASE CALL 1/2 HR PRIOR TO INSPECTION could not access esc
|
Electrical Rough-In | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | FAIL |
Jack Frank
|
|
|
david Phone #: ###-#### Note: please call 1/2 hr prior to inspection not ready and violations met contr. needs instructions for jtub and fan/light above shower, subpanel shall have required clearence of 36", and complete wiring for jtub
|
Reinspection Fee (no hold) | 11/20/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Jack Frank
|
|
|
david Phone #: ###-#### Note: please call 1/2 hr prior to inspection not ready and viloations
|
Rough-In Permanent Service | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PART |
Pat Lass
|
|
|
david Phone #: ###-#### no R/I yet P/S O/H R Ok
|
Electrical Rough-In | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Jim Schmer
|
|
|
david Phone #: ###-#### OK TO COVER WITH CEMENT JMS
|
Rough-In Permanent Service | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 10/21/2008 at 7:21:36 PM. Contact: ###-####.
|
Permanent Service | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | FAIL |
Pat Lass
|
|
|
david Phone #: ###-#### requires concrete encased electrode
|
Application received | | | 10/16/2008 | | |
|
|
|
|
Issue permit | | | 10/16/2008 | | DONE |
|
|
|
|