Final | 11/18/2009 | 11/19/2009 | 11/19/2009 | A | PASS |
Jack Frank
|
|
|
Checked wiring for trimout everthing checked out okay ready for final. Call Rob @ ###-#### for any questions Phone #: ###-#### Internet Inspection Request from: Andy Rose
|
Final | 11/16/2009 | 11/17/2009 | 11/17/2009 | A | FAIL |
Jack Frank
|
|
|
final on electrical, any questions call George @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose called owner is doing work on ele contr permit called told owner he cannot dur that and needs to contact ele contr note owner has been issued stop work for for doing elect work before , he only owns the trailer , he is not the land owner
|
Rough-In Permanent Service | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | PASS |
Jack Frank
|
|
|
re inspection for rough in, any questions call George @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose r/i p/s ok
|
Rough-In Permanent Service | 10/23/2008 | 10/24/2008 | 10/24/2008 | A | FAIL |
Jack Frank
|
|
|
inspection service and new addition, any questions call George @ ###-#### Phone #: ###-#### Internet Inspection Request from: Andy Rose met contr no nails in plastic boxes, correct box fill derate, conductors in 2" pvc at 50%
|
Application received | | | 10/20/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 10/20/2008 | | |
|
|
|
|
Issue permit | | | 10/20/2008 | | DONE |
|
|
|
|