Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberELE08-03233
StatusFinaled
Name L & K ELECTRIC
Site Address 2390 E FREIGHT ST
Project NameWinco Distribution Center
Customer Number342-6381
ePlanReview 
Description
Electrical Permit - New: New construction of commercial building
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice9/18/20099/18/20098/26/2010 DONE
DetailsBob Reichert
This permit finaled on the web by Laura Longshaw
Final9/17/20099/18/20099/18/2009PPASS
DetailsBob Reichert
This will be a final please. Contact is Dennis. Thank you and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw corrections made, 412 and 370 did inspection, ok to final, signed structural card, no esc this project
Final9/16/20099/17/20099/17/2009PFAIL
DetailsBob Reichert
This will be a final inspection please, Contact is Dennis. Thank you for everything and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw met contractor and 412 for inspection with 370, left correction notice,NEC 200.2(B) grounded conductor shall not depend on a connection to a metallic enclosure for continuity, 250.119(A) (1) shall identify grounding conductors for equipment, 312.5 shall provide abrasion protection for all conductors entering enclosures, no esc this project
Conference8/28/20098/28/20098/28/2009ADONE
DetailsMike Kinnear
courtesy inpection only we saw NEC250.148, 210.63, 427.22, &406.8 code problems. Gave correction notice to Drew with Edgewood Electric.
Final8/20/20098/20/20098/20/2009PPART
DetailsBob Reichert
This is a reinspection from yesterday for a final. Contact is Rey. Thank you and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw both 412 and 370 looked at re-located disconnect switch that was moved to meet code, bollards are not yet moved, correction notice was written earlier on bollards, in the upper junction boxes the neutral wires were removed and pulled in white per code, the conduit systems by the upper junction boxes need conduit strapping and mc supports, no esc this permit
Final8/19/20098/19/20098/19/2009PPART
DetailsBob Reichert
This inspection will be for the engine room. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw 412 and 370 did inspection for this area and other response on 8-5-09, still need locknuts, bushings,conduit strapping, covers and drains installed, condulets closed, ko seals for areas for the engine room, will call for inspection for tomorrow for coreections for disconnect at switchgear area
Final8/5/20098/5/20098/5/2009PPART
DetailsBob Reichert
This inspection will be a reinspection for TCO. Contact is Rey. Thank you and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw still working on list of items, need to schedule inspection for ammonia area, told contractor owner can move things in, did not sign t/o card yet
Final7/31/20097/31/20097/31/2009APART
DetailsBob Reichert
This inspection is for TCO. Rey is the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw no tco given, looked at ceilings dry storage area, need to install drip shield, affix all panel schedules and panel voltage signs, secure phone sealtite at north of area, tighten boxes at sprinkler riser area, met 412 to inspect with, no esc this project, told that customer can begin moving in but needs to concur with structural
Temporary Service7/31/20097/31/20097/31/2009ACANC
DetailsBob Reichert
This inspection will for TCO. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw Inspection cancelled from web by: Laura Longshaw
Conference7/15/20097/15/20097/16/2009PDONE
DetailsMike Kinnear
This conference would like to have Mike Kinnear to attend to discuss code requirements before final. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw t/w mike, drew, justin, & stu white regarding final.
Conference7/15/20097/15/20097/15/2009PDONE
DetailsBob Reichert
met contractor to discuss procedure for starting final inspections, and process for t/o for buildings, met with Drew, Mike, Justin, and Stu, and 412
Permanent Service6/2/20096/2/20096/2/2009PCANC
DetailsJack Frank
This inspection will be for switch gear/main service. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw Inspection cancelled from web by: Laura Longshaw
Electrical Rough-In6/1/20096/1/20096/1/2009PPART
DetailsMike Kinnear
This incpection will be for roughin underground. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In5/20/20095/21/20095/21/2009APART
DetailsMike Kinnear
This inspection will be for underground. Contact is Rey. Thank you and have a great morning. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In5/13/20095/13/20095/13/2009PPART
DetailsMike Kinnear
this will be for an underground inspection. Contact will be Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In5/5/20095/5/20095/6/2009PPART
DetailsMike Kinnear
This will be a re-inspection for underground rough-in.Contact will be Rey ###-####.Thanks and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In5/4/20095/4/20095/4/2009PPART
DetailsMike Kinnear
This will be an underground rough-in inspection.contact will be Rey ###-####.Thanks and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In4/22/20094/22/20094/22/2009PPASS
DetailsMike Kinnear
This is for an underground inspection please. Contact is Rey Torres. Thank you and have a great sunny day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop note they need to get the proper permitsa grouped with the bld permitd asap.
Electrical Rough-In4/16/20094/17/20094/17/2009APART
DetailsMike Kinnear
This will be for an underground inspection please. Contact name is Ray Toress. Thank you and have a great day Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In4/14/20094/15/20094/15/2009ACANC
DetailsMike Kinnear
This will be a partial rough-in on walls in the office area.Contact will be Rey.Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw wrong permit number they have to get the permits grouped properly
Electrical Rough-In4/8/20094/8/20094/8/2009PPART
DetailsMike Kinnear
This will be for a rough-in underground inspection. Contact is Ray Torres. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In4/6/20094/6/20094/6/2009PPART
DetailsMike Kinnear
This will be an underground rough-in inspection.Contact will be Rey.Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Conference3/13/20093/13/20093/13/2009ADONE
DetailsMike Kinnear
t/s edgewood regarding permits & journeyman cards
Electrical Rough-In3/3/20093/3/20093/3/2009PPART
DetailsMike Kinnear
This inspection will be for the lighting. Contact is Rey Torres. Thank you and have a great day.
Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok ceiling fixtures
Temporary Service2/19/20092/20/20092/20/2009ACANC
DetailsMike Kinnear
This inspection will be for the temp. power for building. Contact will be Rey Torres. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw needs seperate permit for temp service grounding needs to be fixed & se cable needs to be id for weather & sunlight resistant
Electrical Rough-In1/26/20091/26/20091/26/2009PPASS
DetailsMike Kinnear
This will be for a rough-in underground inspection please.Contact is Rey.Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In1/22/20091/22/20091/22/2009PPASS
DetailsMike Kinnear
Underground roough in Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under slab conduit anop
Electrical Rough-In1/20/20091/20/20091/20/2009PPART
DetailsMike Kinnear
Underground rough in Contact Rey Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In1/14/20091/14/20091/14/2009PPASS
DetailsMike Kinnear
This will be for a rough-in uderground for follow up from yesterday. Contact is Rey Torres. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In1/13/20091/13/20091/13/2009PPART
DetailsMike Kinnear
This will be for a rough in underground inspection please. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw shall get spacing for duct bank the rest of the area ok to cover
Electrical Rough-In1/8/20091/8/20091/8/2009PPASS
DetailsMike Kinnear
This will be for a partial rough in underground inspection. Contact is Rey Torres. Thank you and have a great day Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In12/31/200812/31/200812/31/2008PPASS
DetailsMike Kinnear
This will be for a partial underground. Contact name is Rey Torres. Thank you and Happy New Year Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit anop
Electrical Rough-In12/22/200812/22/200812/22/2008PPART
DetailsMike Kinnear
This inspection will be for a partial underground rough in please. Contact person will be Rey Torrrs. Thank you and drive safe Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover under ground conduit at panel rm A
Electrical Rough-In12/18/200812/19/200812/19/2008AFAIL
DetailsJack Frank
This inspection will be for a partial underground please. Contact name is Justin Metcalf. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw
met with justin inspection of duct bank for p/s failed not maintaining spacing, asked what prints require, he said prints do not address it looked at prints they do show engineered detailed drawings , contr will correct and call for reinspection
Electrical Rough-In12/15/200812/15/200812/15/2008PPASS
DetailsJim Schmer
This will be for an underground inspection please. Contact name is Justin Metcalf. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw looked at two trenches and told Justin to make arrangements with mike for how to inspect.
Owner Supplied Equipment  12/15/2008  
Application received  12/15/2008 DONE
This permit was created on the web by Laura Longshaw